Historical Exploration
Drilling in 1981 by Amok returned an intersection of 0.89% U3O8 over 2.6m. In 2006, ESO carried out drilling which encountered extensions to the known mineralization in two of the eight holes drilled. Drill Hole CLU-01 intersected 0.46% U3O8 over 1.5m (174.0 – 174.5m) and CLU-07 intersected 0.17% U3O8 over 7 metres (153.0 to 160.0m) including one metre of 0.82% U3O8 and 0.20% U3O8 over 2.0m (175.0 to 177.0m). The structure has been traced along surface for 700m and is the main target for continued drilling.
|
click here to view the claim outline
|
Adrian Bray, P.Geo., is a Director of Logan and a Qualified Person as defined by National Instrument 43-101 for the above mentioned project. The QP is a member in good standing of the Association of Professional Engineers and Geoscientists of British Columbia (APEGBC) as a registered Professional Geoscientist (P.Geo.). Mr. Bray has reviewed and is responsible for the technical information disclosed above.
|